Details for Shoshone-Paiute Tribes of the Duck Valley Reservation Owyhee, NV West

Updated

Shoshone-Paiute Tribes of the Duck Valley Reservation Owyhee, NV West Main Headworks and Thacker Check Replacement Sealed Bids for the construction of the West Main Headworks and Thacker Check Replacement will be received by the Shoshone-Paiute Tribes of the Duck Valley Reservation, in the Water Resource office at the office of the Water Resource Director, until 5:00 pm Mountain Time on February 8, 2019 at which time the bids will be publicly opened and read aloud. Construction of the work will occur in the Fall of 2019, The Project generally consists of: Demolition of the existing West Main Headworks; construction of a new West Main Headworks structure; construction of a new Thacker Lateral Check Structure; procurement and installation of miscellaneous metal work for both the West Main Headworks and the Thacker Check, including but not limited to guard rails, walkways, and stop log guides; structural excavation and backfill; and procurement and installation of riprap; and other incidental items of work. Bids will be received for a single prime Contract. Bids shall be on a lump sum and/or unit price basis, with additive or deductive alternate bid items (if any) as indicated in the Bid Form. Complete bidding documents for this project are available in electronic form. Printed copies of the bid documents are not available from the Engineer or the Owner. Bid documents may be viewed online and downloaded without charge and without deposit from www.aeplans.com. If softwareebsite technical assistance is needed please call toll free (888)-320-3032. Downloaded files may be printed on the plan holder's equipment. Printed copies may be ordered from reprographic companies through the website or by contacting a reprographer directly. Plan holders are responsible for their own reproduction costs. Go to www.aeplans.com to download West Main Headworks and Thacker Check Replacement plans and specifications. No hard copies will be sent. Addenda to the project will be posted on the website and registered plan holders will be provided e-mail notification of addenda when posted. BIDDERs must register through the web site to be notified of addenda. The BIDDER is responsible for periodically checking the site. The CONTRACTOR that is awarded the project will be responsible for printing all documents necessary for performing the work. A pre-bid conference will be held at 1:00 P.M. Mountain Time on January 30, 2019. Perspective bidders will meet with the Water Resource Director at the Tribal Headquarters; the Water Resource Director will accompany meeting attendees to the project locations. Attendance at the pre-bid conference is highly encouraged but is not mandatory. For questions, please contact: Jeffrey Olsson, P.E. Project Manager 1300 Cedar Street Helena, MT 59601 Direct: 406-324-7414 Mobile: 406-202-8436 jolsson@dowl.com Shoshone-Paiute Tribes of the Duck Valley Reservation is an Equal Opportunity Employer. Jan 9

Categories

You may be interested in

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.